Work is currently underway on the completion of a 500 m² cold room and a 100 m² freezer room at Aalborg Harbour In a few days, the project will be ready for delivery.
The rooms are constructed with walls and ceiling in 200 mm PIR panels – with an EI60 fire classification. In addition, underfloor heating and floor panels with non-slip phenolic coating have been supplied in the freezer room. In addition to that, gates and doors have also been installed, so that both rooms are ready for use upon delivery.