DC System has delivered thermal panels for Denmark’s first zero-energy office building to Aarhus municipality.
For this special project, prefabricated insulation panels have been chosen for all facades and blind pieces in the window bands. At the same time, panels have been delivered for the renovation of the facades of the existing building.
2,500 m² of thermal panels with cement-based chipboard have been delivered for the new building. The facade is subsequently covered with recycled glass, which gives an exciting and aesthetically finished result.
For the existing building, approx. 500 m² post-insulation panel with mineral wool. The facade is then mesh plastered.